wpabc631b4_1b.jpg







wpd5203dfe_1b.jpg
wp0f3c8f13.gif

Needed Street Work in

Alta Vista

wp21cd6247_1b.jpg
wp9d9e5a7d_1b.jpg
wp82cb4ef9_1b.jpg
wp1d12da04_1b.jpg
wpe631ff31_1b.jpg

A nice manhold cover at the end of W. French and the railroad tracks

Patching North Flores between W. Summit and W. Agarita.

Scenes of resurfacing along West French. The entire length of the street in Alta Vista, from San Pedro to the railroad tracks, will be resurfaced.